Final project installation
This is the first visual of my final project installation. I also met
with a perspex fabricator this week to discuss the technical issues involved
in manufacturing the box. He has recommended using 5mm perspex and gluing
the edges together.
There are still some small issues of detail (for example, the position
and size of a recessed area on top of the box to place the mouse) to be
resolved. I am awaiting a cost from him and should have it soon.
To suspend the LCD screen he will glue 4 blocks with eyelets to each
of the top inner corners.
|